1 REMOVAL OF PAVING IN AREA TO REPAIR LOT 1 $ 2,900.00 $ 2,900.00
2 HAND EXCAVATIONS AND ROTARY HAMMER FOR PILES ROAD SUPPORT PZAS 4 $ 1,200.00 $ 4,800.00
3 30X30 CM REINFORCED CONCRETE PILES WITH 5/8 PIECE ROD 4 $ 4,100.00 $ 16,400.00
4 LOAD LOCK ON 25 X 45 PILES ASSEMBLED WITH 5/8 RODS AND 3/8 RING AT EACH 17 CM ML 13.2 $ 1,050.00
$ 13,860.00
5 REINFORCED CONCRETE SLAB TO 20 CM THICK TO SUPPORT PASSAGE OF TURNING TRUCK M2 19.8 $ 950.00 $ 18,810.00
6 READOQUINAR AND CONTINUE DROWNED STONE FOOTPRINTS M2 19.8 $ 380.00 $ 7,524.00
7 CONTINUATION OF EXISTING TAP AT 20 CM HEIGHT ABOVE TABLEWARE ML 13.2 $ 280.00 $ 3,696.00
8 CLEANING AND REMOVAL OF GARBAGE LABOR PRODUCT LOT 1 $ 500.00 $ 500.00
SUB-TOTAL $68,490.00
TOTAL = $68,490.00
Current exchange rate apos 21 = $3,261 usd
-------------------
ARQUITECTO. CONSTRUCTOR.
Javier Mendoza Ruiz. A. Javier G. Montes de Oca.
Cel. 321 100 82 54 Cel. 315 110 33 23
Email. xavii.jh22@hotmail.com Email. arjagomo@hotmail.com
Presupuesto para; REPARACION DE CAMINO
OBRA NEGRA
# CONCEPTO UNIDAD. CANTIDAD. P. UNITARIO. TOTAL.
1 REMOCION DE ADOQUIN EN AREA A REPARAR LOTE 1 $2,900.00 $2,900.00
2 ESCAVACIONES A MANO Y ROTOMARTILLO PARA PILOTES SOPORTE DE CAMINO PZAS 4 $1,200.00 $4,800.00
3 PILOTES DE CONCRETO ARMADO DE 30X30 CM CON VARILLA DE 5/8 PZAS 4 $4,100.00 $16,400.00
4 TRABE DE CARGA SOBRE PILOTES DE 25 X 45 ARMADA CON VARILLAS DE 5/8 Y ANILLO DE 3/8 A CADA 17 CM ML 13.2 $1,050.00 $13,860.00
5 LOSA DE CONCRETO REFORZADO A 20 CM DE ESPESOR PARA SOPORTAR PASO DE CAMION DE VOLTEO M2 19.8 $950.00 $18,810.00
6 READOQUINAR Y CONTINUAR HUELLAS DE PIEDRA AHOGADA M2 19.8 $380.00 $7,524.00
7 CONTINUACION DE MACHUELO EXISTENTE A 20 CM DE ALTURA SOBRE ADOQUIN ML 13.2 $280.00 $3,696.00
8 LIMPIEZA Y RETIRO DE BASURA PRODUCTO DE TRABAJO LOTE 1 $500.00 $500.00
SUB-TOTAL $68,490.00
TOTAL = $68,490.00